Today@Dal
» Go to news mainConstruction at B Building
Please be advised that there will be construction activity at the entrance of the B Building off Dacosta Row Monday, December 2 and Tuesday, December 3 from 9 a.m. to 3 p.m. both days.
The B building entrance off DaCosta row will be blocked off along with the walkway and bike racks. Please use other entrances to the complex during this time (figure one below).
The MacDonald Building walkway from Dacosta Row and the associated entrance will remain open (figure two below).Ìý
This closure is necessary to offload and properly store construction materials.
Ìý
Recent News
- McCall MacBain Scholarship info session
- Seeking youth 9‑15 for clinical trial of CMV vaccine
- In Memoriam: Dr. Philip Welch
- Guidance for use of generative A.I. tools in research
- 5th annual Employee Wellness Day
- Job postings
- Dal Bookstore celebrates African Heritage Month with local Black‑owned brands and inspiring literature
- Karaoke and Open Mic Night at The Social